When installing the x axis platform it is necessary to instal one m5 square nut in the left and two in the right channel AFTER sliding the first rod and its end supports into the side extrusion but before sliding in the second set of rod and end supports. If not, then the last extrusion will not fit as the m5 nuts will be in the way and also there will be no captive m5 nuts in the right place for the later step.
In summary the three m5square nuts (one on left and two in right) must rest between the two rod support blocks.
Fortunately, the error is soon apparent as the two nuts on the right side of the frame prevent the fourth side of the base frame from being installed flush.
Hi guys,
I got my printer 2 days ago and have only been able to spend 4 hours so far, but also found the problem with the square nuts. Reading ahead in the assembly manual allowed me to see what they are for, so I realised where the mistake is.
Please supply more info on the wiring colours - I am not there yet, but would appreciate a heads-up!
I don’t know if ntoff has found any major issues with the wiring colours but I have noticed that both the online instructions and download incorrectly refer to connection of the ‘red’ wire on the stop switch connectors. This should read ‘orange’ as the instructions earlier show the red wire being removed from the connector.
If Velleman are actively maintaining the documentation, can I suggest that it would be helpful if you could you add version control to the documents as either a version number or an issue date.